Geohazard Screening

Field notes: the segment that moved two inches, and the ones that didn't

An eroded hillside cut showing layered soil and exposed rock along a sloped bank.

Two segments, same corridor, same vintage of pipe. One shows about two inches of vertical change between annual passes. The other shows almost nothing. On paper the first one looks like the problem. Walk the ground and it's the other way around.

The segment that moved sits on a long sidehill cut, the kind built in the 1970s when "balance the cut and fill" meant something different than it does now. The fill side has always been soft. Two inches of settlement there is the slope doing what that slope does every wet spring, and it does it slowly enough that the pipe has room to flex with it.

The segment that didn't move is a bench cut through weathered shale on a steeper grade, with a drainage crossing less than two hundred feet upstream. Nothing registered in the differencing this year. But the toe of that slope has a hairline scarp from a slip nobody logged, and the kind of material that fails all at once rather than creeping. A flat zero on that segment just means nothing moved enough to show up in this year's pass, and the scarp at the toe is the fact that actually carries weight.

This is the part of the job that doesn't show up in a spreadsheet column. A screening pass gives you elevation difference, pixel by pixel, segment by segment, run once a year against the last run. It doesn't know which two inches is boring settlement and which half inch is the start of something. That reading still belongs to whoever knows the geology, the drainage pattern, the repair history. What the screening pass is good for is narrowing the corridor down to the handful of segments worth that attention in the first place, instead of spending a field season walking all of it to find out.

That's the actual value of annual differencing over a long right-of-way. It triages the corridor, and the verdict on any one segment still comes from the person who walks it. A segment that shows movement two years running, even small movement, earns a closer look before one that shows a single noisy spike and nothing since. A segment with no signal at all but a known history of slow creep earns a check-in anyway, because stereo-derived elevation differencing over bare or sparsely vegetated ground has its own blind spots, and a segment under heavy canopy or recent snow can sit quiet in the data for reasons that have nothing to do with the slope underneath it.

Treating the screening pass as a triage tool, rather than a verdict, is what keeps it honest. It ranks where the geotech crew goes first, and the crew still does the actual diagnosis on the ground. The corridors that get this right tend to pair the annual pass with whatever local knowledge already exists: the crossing that silted up last spring, the segment that's needed slope repair twice before, the fill that's always been the soft one. The data tells you where the ground changed. It still takes someone who's walked that stretch to say whether the change means anything.

That's roughly the job this site is built around: taking a corridor nobody has time to walk end to end every year and turning the elevation differencing into a ranked shortlist of segments worth a field look, starting with the one that moved.

If you're screening a corridor this season, send over the geometry and we'll put together that first ranked list.

Request early access

← Back to the blog