Geohazard Screening

Field notes: the year between two flights

Grassy hillside with gentle slopes under a dusky sky.

A corridor doesn't hold still just because nobody's looking at it. Between the flight that gave you last year's baseline and the one that gives you this year's comparison, the ground has been doing what ground does on a slope with pipe under it: wetting, drying, freezing, thawing, creeping a few millimeters at a time toward the toe, then sometimes just letting go.

You don't see most of it happen. That's the part worth sitting with for a minute.

What the gap holds

Take a typical mile of right-of-way cut across a hillside in a wet corridor. In the span of one year it might see a dozen rain events heavy enough to move soil, two or three freeze-thaw cycles that heave and settle the upper few feet, a dry season that opens tension cracks nobody walks far enough to find, and a wet season that closes them back up with a little less slope than it started with. None of that shows up as a single event in anyone's notebook. It shows up, if it shows up at all, as a difference between where the ground was and where the ground is now.

That's the real case for annual elevation differencing over a corridor: it catches what the storm left behind, the slow stuff a walked inspection usually misses because there's nothing to see yet. A walked inspection finds the slide that already happened, the washout that already exposed pipe, the scarp that's already visible from the access road. Differencing finds the slope that moved eight centimeters and is still, as far as anyone can tell by eye, just a slope.

Thinking in segments

The other thing a year does to a corridor is make the problem length-based rather than point-based. A geotech walking a known problem area checks the ten meters they already flagged. But creep doesn't respect flagged boundaries, and a corridor that's been quiet for three years can start moving in a stretch nobody had on the list, usually right after the stretch where someone regraded a borrow ditch or the stretch below a culvert that's been running a little fuller than it used to. Comparing one year of elevation against the last one, segment by segment along the whole route, is how that kind of quiet mover gets caught before it's a dig.

The output comes back as a ranking across every segment on the route, not a single flashing light. Some segments moved and settled. Some moved and are still moving. Some didn't move at all, which is its own kind of useful information when you're deciding where the crew goes first next spring.

What annual cadence can and can't tell you

Worth saying plainly: a once-a-year comparison won't tell you which storm did the damage, or whether the movement was gradual or happened in one bad week in March. It tells you that between flight one and flight two, this segment's elevation profile changed in a way consistent with slope movement or washout, and that one didn't. For a corridor engineer trying to prioritize a limited number of geotech visits across a long route, that's often exactly the resolution you need. It tells you where the incident report is more likely to come from next, which is a different and more useful thing than writing one after the fact.

That's the whole premise behind Geohazard Screening: take the stereo-derived elevation from this year's pass, set it against last year's, and hand back a ranked list of which stretches of corridor earned a closer look. It won't replace the geotech's boots. It just tells you which stretch to put them on first.

If your corridor's due for its next annual pass, that's a conversation worth starting now, before the ground does anything else while nobody's watching.

Request early access

← Back to the blog