Every integrity engineer with a river crossing on the books knows the drill: pull the as-built, check the last inspection date, and hope the channel hasn't moved since. Scour at a crossing doesn't announce itself. A bank can creep for two seasons before anyone notices the pipe's depth of cover has gone from six feet to two. By the time a landowner calls about exposed pipe, you're already behind.
Scoring a crossing for scour risk from satellite imagery is about deciding which crossings get a geotech assessment first.
What scour actually shows up as in elevation data
Scour and bank migration both leave a signature in surface elevation, not just in a color photo. A channel that's cutting into its bank shows up as a local elevation loss on one side and often a corresponding gain downstream where the sediment lands. A slope above a crossing that's starting to creep shows a slower, broader drop across the hillside rather than a sharp notch at the waterline.
Panchromatic imagery alone, even at sub-meter resolution, only shows surface appearance. A bank that looks different between two dates can mean three feet of erosion, a trick of shadow, or a different sun angle on the capture dates. Stereo-derived elevation data fixes that. Two overlapping images captured from slightly different angles build a surface model, and differencing that model year over year produces an actual vertical change, measured in meters.
A workable scoring method for a corridor
A corridor with dozens of crossings calls for a ranking method that works across all of them, not a bespoke scour model for each site. A simple version:
- Pull annual elevation differencing for a buffer around each crossing, typically extending upstream and downstream of the centerline and out to the top of bank on both sides.
- Flag any segment where the year-over-year change exceeds a threshold you set based on local soil type and channel size. A gravel-bed mountain stream and a slow meandering clay-bed river don't move the same amount in a normal year.
- Cross-reference against known HCAs, class locations, and last-known depth of cover. A half-meter of bank loss at a crossing with four feet of cover and no HCA ranks lower than the same movement at a crossing already flagged for shallow cover near a populated area.
- Rank the output into a single list ordered by movement and consequence.
The output is a priority order rather than a scour depth number for a stress calc: crossing 14 moved more than crossing 22, and because crossing 14 has thinner cover, it gets the field crew first.
Where this method runs out of road
Annual cadence gives you change between two snapshots a year apart, which can miss a scour event that happens and partially fills back in before the next capture. Vegetation cover, especially dense riparian growth, can mask the true ground surface in a stereo-derived model, which matters more at some crossings than others depending on canopy. And a satellite-based elevation comparison tells you where the ground moved. It doesn't tell you why, or whether the pipe itself is exposed. That's still a field call.
That makes the screening step a triage tool, which is what most integrity programs actually need between full assessments. Walking or flying an entire right-of-way every year to eyeball every crossing is slow and expensive, and a lot of that effort goes toward crossings that haven't moved at all.
Getting from a ranked list to a dig decision
Once you have a ranked list of crossings by elevation change, the next step is the one your program already runs: send the geotech crew to the top of the list, confirm depth of cover with a hand probe or vacuum excavation, and update your risk register. The screening tells you where to start.
Geohazard Screening applies exactly this kind of stereo-derived elevation differencing along a full corridor, handing back a ranked list of corridor segments that shows slope creep or washout signatures over buried pipe. It's early-stage, a shortlist tool rather than a finished monitoring product, which is the honest way to describe where it is right now.
If a river crossing or two on your line has been nagging at you since last season's high water, it might be worth getting on the early list.