What is a geohazard register, and how do pipeline operators keep one current?

A rural farmhouse with a wooden fence and open fields under a blue sky, typical of land along a pipeline right-of-way.

A geohazard register is the master list integrity teams keep of every spot along a pipeline right-of-way where ground movement, slope failure, or erosion could load, expose, or rupture buried pipe. Some operators call it a geohazard inventory, some fold it into the broader pipeline risk register, and some keep it as a standalone geotechnical hazard log that feeds into the risk register at review time. Whatever the filename, the job is the same: one place that says where the ground is a threat, how bad it could get, and what's been done about it.

If you've inherited one of these from a predecessor, you already know the format varies by company and sometimes by pipeline segment within the same company. Most registers converge on a similar set of fields, because they're answering the same handful of questions during an integrity management review.

What a working register tracks

A working geohazard register usually tracks, per hazard site:

  • A unique identifier tied to milepost or station number, so it links cleanly to your alignment sheets and GIS
  • Hazard type: landslide, slope creep, washout, scour, subsidence, karst, or seismic displacement
  • Date identified and source (geotech report, aerial patrol, landowner call, post-event inspection)
  • Consequence if it progresses: pipe exposure, bending strain, span, or full separation
  • Current mitigation status: monitored, stabilized, slope regraded, no action planned
  • Date of last field verification and who did it
  • Photos or survey data tied to that date

The register indexes the geotechnical work rather than replacing it: it tells you which reports exist, where they apply, and when they're due for another look. Keep the detailed slope-stability calcs and boring logs in your document system; the register just needs enough to triage.

Keeping the register current is the hard part

Building the first version of a geohazard register is a few weeks of pulling old geotech files, patrol notes, and whatever LiDAR or aerial imagery the company already paid for. The harder part is year two, and year ten.

Ground conditions don't hold still. A slope that was stable at pipeline installation can start creeping after a wet spring. A culvert upstream gets blocked and a new washout forms where none existed in the baseline survey. A register that only gets touched after an incident or during a five-year IM reassessment is archiving what you knew once, not tracking what's changed.

Most operators handle the gap one of three ways: annual right-of-way walks or flyovers to eyeball visible movement across the whole corridor, targeted site visits to the handful of locations already flagged as active, or some version of remote screening that flags where the ground moved before anyone sends a truck. The first option is thorough and expensive at corridor scale. The second is cheap but blind to anything new. The third is where elevation-based screening earns its keep: it tells you which segments moved since last year, giving the geotechnical engineer's judgment a shorter list to start from, so the register gets updated with real change instead of a repeated "no visible issues" entry.

That's the gap Geohazard Screening is built around. It applies stereo-derived elevation differencing along a corridor, comparing this year's surface against last year's to flag slope creep and washout signatures over buried pipe, delivered as a ranked list of segments. Use it alongside the register and your geotech consultant's judgment, as a way to decide which register entries need a field visit this cycle and which ones can wait, instead of walking the whole right-of-way to find out.

A register that earns its keep

A geohazard register that just sits in a binder until an auditor asks for it has stopped doing its job. The ones that hold up under scrutiny, and prevent incidents, get revisited on a cadence, get new entries when conditions change, and get used to decide where geotech crews go next. If your update cycle right now is "whenever someone remembers," that's the piece worth fixing before the next IM plan review.

Curious what an annual ranked list of your highest-movement segments would look like against your own register? That's the whole offer behind Geohazard Screening.